Funding Agency | Title | Amount (Lakhs) | Duration (Years) | Status |
---|---|---|---|---|
![]() Dept.of Atomic Energy(DAE) |
Adaptive Controlled Suction Chamber and Cupbased Wall Climbing Robot. | 27.8 | 3 | Ongoing |
Development of Multichannel Adaptive Active Noise Control System for Reduction of Noise in a Region Adjacent to Noisy equipment. | 30.2 | 3 | Ongoing | |
![]() CAIR DRDO |
Wall Climbing Robot with reduced sound levels using Active Noise Control | 60.6 | 3 | Ongoing |
![]() DAE |
Development of an on-line measurement system for hydrogen concentration in steam environment. | 45.36 | 3 | Ongoing |
Funding Agency | Title | Amount (Lakhs) | Duration (Years) | Status |
---|---|---|---|---|
![]() Bhavini DAE |
Study,modelling,analysis and animation of a remote handling device | 2.8 | 1 | Ongoing |
![]() |
Development of automatic Tea leaf cutter for inclined terrain harvesting | 12.86 | 1.5 | Ongoing |
![]() CAIR DRDO |
Design,Development and characterization of electro static sensor with digital electronic system for Debris Monitoring in Gas turbines | 9.98 | 1.5 | Ongoing |
Development of See Through Wall Passive Eddy Current Sensor for Blade Detection | 9.89 | 1.5 | Ongoing | |
Development of See Through Wall Passive Eddy Current Sensor for Blade Detection | 9.6 | 1.5 | Ongoing |
Funding Agency | Title | Amount (Lakhs) | Duration (Years) |
---|---|---|---|
MNRE | Design and Development of 1 KW Hybrid Vertical Axis Wind Turbine System for Low Wind Speed Regimes (Joint funded Project with Dept.of Mech.Engg.) | 28.5 | 3 |
Funding Agency | Title | Amount (Lakhs) | Duration (Years) |
---|---|---|---|
Chettinad Hospital |
Development of Goniometer using flex sensor |
0.25 |
0.4 |
Funding Agency | Title | Amount (Lakhs) | Duration (Years) |
---|---|---|---|
HITS |
Development of active noise control setup |
2.0 |
1 |
HITS |
Development of Fully automated Solar Panel Cleaning Robot System |
1.6 |
0.5 |